Before & After
Kitchens can be updated by simply replacing appliances and installing new splashback tiles.

Before

After
Renovation to include living room, steam shower in new bathroom area, extra guest bedroom, library, 9 car garage, bulk storage area downstairs and loft storage. Stackable sliding glass and screen doors retreat into cavity wall opening onto two new decks.

Before

After
This client wanted to retain the cabinets and layout with the 40mm existing granite benchtops. New door fronts, handles, splashback and LED lighting were installed. Original opening doors were replaced with drawers with soft closing Blum mechanisms and solid stainless steel kickboards.

Before

After
Concrete base installed and tiles applied to walking area for a new look and maintenance free surface.

Before

After
No hob to shower makes easy access minimises cleaning.

Before

After
Inefficient storage and layout can make everyday tasks harder. It is surprising how easy updating a laundry can be.

Before

After
Upgraded timber, waterproofing tops of floor joists, larger decking gap, 4 coats of DWD applied all around the timber and stainless steel and hot dipped galvanised fixings will make this upgrade long lasting.

Before

After
Flat pack, off the shelf kitchen cabinets and doors matched with custom fitting and 20mm Caesarstone bench tops gives new life and design to a tired existing kitchen.

Before

After
Custom designed steel structure on-site welded and constructed, overlayed with solid spotted gum timber. Laminated 8mm slices of spotted gum glued together to form curved top handrail. Many clamps used to ensure good adhesion. Custom 16mm powder coated steel square dowels with a 3/4 twist meticulously chiselled into top handrail and stair treads to give a seamless finish.

Before

During

After
This client wanted to retain the cabinets and layout. Removal of walls and relocation of fridge created a modern open plan design. New door fronts, handles, splashback and LED lighting were installed. Original opening doors were replaced with drawers with soft closing Blum mechanisms and solid stainless steel kickboards. Laminex 32mm benchtops were used for cost efficiencies and practicalities.

Before

After
Asbestos removed and seepage issues addressed. Plumbing and electrical altered to ensure a multi-function space.

Before

After
Existing toilet wall removed to create new layout and extra space for future disabled access.

Before

After
Face lift to tiles, toilet with new fittings and plumbing.

Before

After
Off the shelf cabinets and benchtop with new tiles and paint to give a new clean look that will last.

Before

After
New cabinets. Stainless steel kickboards. 20mm Caesarstone bench tops. Bevelled splashback tiles give a new functional design and look.

Before

After
New door, sidelights, frame and locks were installed to give an updated look and provide more light and security.

Before

After
Old floor tiles removed from existing concrete and timber framed floor. New timber grained ceramic tiles installed to main house area floor.

Before

After
This is what can be achieved with good design and high quality products and materials.

Before

After
A new layout with well chosen tiles and fittings can totally transform a bathroom.

Before

After
Removal of existing walls to give an open plan kitchen design will make day to day living easier for years to come.

Before

After
Old and worn pine floor boards were replaced with sub-floor of treated plywood with new flooring fully glued and secret nailed to give the highest quality finish.

Before

After
40mm Regal Tan clay paver laid on concrete with detailed inlay giving a lift to the entrance of any home.

Before

After
New layout and mortar base for tiled floor inserted down into existing timber floor to give trip free hazards for elderly or disabled access.

Before

After
Off the shelf flat pack kitchen cabinets and doors matched with custom 40mm laminated benchtop gives new life to kitchen without the high cost.

Before

After
New aluminium bi-fold door custom fitted to existing openings give protection from the beach front elements and security when you need, and the flexibility to open the whole front if desired.

Before

After
Asbestos wall and ceiling linings were removed. New cabinets. Stainless steel kickboards. 20mm Caesarstone bench tops. LED lighting and new appliances were installed. Bevelled splashback tiles give a new functional design and look.

Before

After
New cabinets with extra storage. Stainless steel kickboards. 40mm Laminated bench tops. LED lighting. Bevelled splashback tiles.

Before

After
Fig Tree Pocket Timber Walkway Upgrade - Rotted timber was replaced with F27 kiln dried hardwood bearers and joists waterproofed to the top to prevent any future rotting. Reclaimed timber posts and handrail were used to give a rustic look. 12v lighting was also incorporated to give a well lit night path.

Before

After
Get In Touch
The concept of Stealth Building Solutions comes from an idea that once we identify the building problem, we can propose a solution to fix or minimise the issue efficiently, cost effectively and quickly.
Get in touch via the contact form or email us at info@stealthbuild.com.au.